Our services.

  • An American flag waving on a flagpole outside a modern building with large glass windows, against a partly cloudy sky. Depicting project controls services for the state of louisiana and government contracts

    Government/state services

    For government contracts, we offer:

    •Project monitoring and control via Primavera P6 and other tools

    •Access to advanced technologies you may not be aware of

    •Solutions designed to maximize project value 

  • An industrial oil refinery with numerous tall towers and piping, emitting white smoke into a cloudy, overcast sky. Depicting project controls services in the state of Louisiana mainly in the Gonzales area for planning, scheduling, training, and cost

    Oil and gas

    We specialize in helping oil and gas facilities manage capital projects and turnarounds. Our interactive worklist replaces unproductive meetings, and our custom floating schedules are built to align with your budget and timeline. We also offer tools to speed up the scheduling process and ensure consistency.


  • Construction workers in safety vests and helmets walking on a concrete surface, observing a large building under construction Depicting the ability of align industrial to provide project controls services in Louisiana from concept through closeout.

    concept through closeout

    Our team can perform schedule quality analysis on complex project and turnaround schedules. We can also vet a scheduler’s qualifications. The team provides a comprehensive report detailing how the schedule was built, recommending update methods, and ensuring Primavera P6 settings are correct to meet your project goals.

our services ensure accuracy and prevent delays

  • Prevent project failure: A scheduler's main task is to create, monitor, and update the project schedule. Without a robust schedule, it's impossible to properly allocate resources, manage timelines, and mitigate risks, which can quickly lead to project failure.

  • Avoid hidden inaccuracies: An unqualified scheduler may set up the schedule incorrectly in the software (like Primavera P6), leading to a baseline that is fundamentally flawed. This can hide problems until it's too late to fix them without incurring significant costs and delays.

  • Allocate resources properly: Schedulers must understand the project's resource needs and ensure that manpower, equipment, and materials are available when needed. An unqualified scheduler might misallocate resources, causing bottlenecks, idle time, or unnecessary overtime..